Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Quick Guide

The quick guide is giving you a quick overview of the basic work flow operators must know to get a report that contains the most important inspection data

...

Once you have rearranged the panels according to your personal needs for the acquisition of main and lateral sections (satellites) or manholes this individual view (profile) can easily be saved for further WinCanVX sessions via the tab Views. The main interface (group of panels) as well as each single panel of course can be maximized to full screen size.

Launching WinCan VX

...

Double-click on the WinCanVX desktop icon in order to launch the software. First get your personal license code activated (4) using the tab command Home > Manage License > License settings (1,2,3):

...

This information is crucial as all inspections are assigned to a job and not to a project directly. A project on the other hand always contains just one single job (1 Project = 1 Job).

Entering project data

...

Switch to the tab Sections to start with the survey. All data (i.e. section, inspection and observation records as well as media data) are saved continuously within the folder structure, which is administered in the background by WinCanVX:

...

IMPORTANT:
WinCanVX NEVER deletes your data: deleted sections, inspections, laterals or manholes can always be restored via the project manager (Projects > Manage Projects). Deleted photos and video clips are moved directly into the project sub-folder TRASH and can be restored from there.

Recording and Playing Back Video Clips

...

Always check the LiveVideo settings prior to start recording video clips with your camera equipment: WinCan VX officially supports two MPEG-encoding devices. After the installation of the software package WinCanVXDriverSetup.exe the corresponding entries appear in the dialogue box as shown below:

...