Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The WinCan main screen provides a quick access to the project list available inside the project manager. This view also allows the user to create groups which existing projects can be assigned to: Right-click on the basic folder Unassigned, create (1) and rename (2) as many folders (groups) as needed and drag the corresponding projects from the list directly to the desired folder (3).

Always mind that you lay the mouse pointer over the project symbol (4) before you drag the object to the target folder:

...

Existing folders can be moved and deleted or renamed via the contect menu (5). When deleting a folder, WinCan is automatically going to move any projects back to the basic folder Unassigned.

...

At the end of the folder list an arrow button (6) is giving access to another command group. Select the command Project list options (7) to edit the order of the folders (8) or to specify folders you want to hide (9).

...

To quickly look for a specific project, simply type a part of the project name into the search field located below the group list (10) and WinCan is going to filter out the corresponding project(s) directly (11).

...

Closing Project

The Close Project button ends the current project and saves all changes in their respective directories. This is a convenient option, which tales the se back to the main screen for new projects with WinCan VX in a neutral state.

...

Refreshing Project

The Refresh Project command helps the user to update the current project. This is useful at various times during project work including refreshing the outputs to WinCan Map and after merging data from other projects.

...