Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

WinCan WebFlex Quick Start Guide; will guide you through the setup and , configuration and general layout of WinCan WebFlex. This document will also guide you through the creation, publication and sharing of projects that were either, created from scratch within WinCan WebFlex, imported into WinCan WebFlex from WinCan VX or imported from a camera system that has an embedded WinCan Client.

...

If your project has Structural or service code that have not been scored (projects that may have been imported from 3rd party systems) you can re-run the scoring process from the PROJECT TAB, SCORING

...

Project Report Creation/Generation

Types of Project Reports

When a project has been completed to ”your ”you or your customers” specific requirements a PROJECT REPORT can be created and . these project reports can be either active or passive (with or with out weblinks).

Passive Project Reports

Are reports where the project is not shared and therefore WILL NOT have “Active Web links on the report”

To create a Passive report

...

  1. Project Tab

  2. Reporting

  3. Generate report

  4. Report is create with no active weblink

...

Active Project Reports (reports with hyperlinks)

Are Reports that have active hyperlinks within the report that can be either unlimited or limited in duration.

To create an active report, you will need to first enable or create a Project link for that specific project prior to creating the report. This,

The “project link” can be either set ;

Set at a global level for (across all projects and once set will affect all projects imported or created thereafter, or at a local project lever for each and every project individually . within your company WinCan Web account) and will add an “Unlimited” duration link for all projects created ‘post’ enabling of this option.

Or, created for each individual project as and when you choose to add one. Individual links take precedent over unlimited links and have custom durations from 1 day to whenever you choose to expire that link.

Create a unlimited project link for all projects.

Prior to printing/generating the report for your report project, you will need to active an shared linkshare the project (reports created before the project is shared will not have active hyperlinks and will need to be regenerated again after the link has been created).

From the main window select Account setting- Company Profile, slide edit mode to the right, scroll to the bottom of company profile and tick box “Create project link after uploading”, complete the edit by moving the edit button back to the left.

This is a global setting and only needs to be completed once for the entire account, however project that have already been uploaded with reports will need that report regenerated.

...

Create a link per project.

Go to the main project Window,

  1. select Select the link icon for the specific project,

  2. select Select new link,

  3. Select create new link

  4. decide on your options

  5. Select okay to confirm your settings

Project link.jpgImage Added

Once your link has been created you will be able to see the active link against that project by selecting the link button (selection 1 in the above process). When the link icon is selected the below window will appear.

Project link Options.jpgImage Added

  1. Active till date, can be unlimited of a date

  2. Is this project downloadable by your client, ticked, yes, unticked no

  3. Edit the Active till and downloadable option

  4. Delete link

  5. Open the project from a customer perspective (Very cool feature)

  6. Copy link (copy link and add it to an email)

  7. Email link directly from WinCan Web (great feature but client email spam filters often kill the email before it gets to the client!!!!, use option 6 and copy the link and email it directly or send them an active report with links in)