...
This documentation describes how drone projects can be prepared in the Flyability Inspector to be imported in a TV operator can record data with the drone system ELIOS 2/3, manage them with the software Inspector 4.0 from the company FLYABILITY and finally import the data package into WinCan VX.
Requirements
A The import of drone data requires a WinCan VX Expert software licence incl. module/feature 3060 is required for the drone import. This license but the additional license slot is not activated by default. If you have an Expert licence, per default, so please contact us at sales@wincan.com with giving the keyword "drone import". The module will then be activated free of charge.
...
Title
...
Requirement
...
Remark
...
License
...
-Expertlizenz wit module/feature 3060
-Only available for Software licenses (no USB dongles)
...
All elements which are necessary for recording, managing and importing data from the ELIOS 2/3 drone systems are listed below:
Element | Requirement | Remarks |
---|---|---|
Flyability Hardware: ELIOS2/3 drone system | - | Check www.wincan.com for more details |
Flyability Software: Inspector 4.0 | Premium version, that creates the trajectory point cloud of the drone flight | Contact Flyability for more details |
WinCan VX, License | License package: EXPERT Addtional license slot: 3060 License system: Software license (no USB-dongles) | Conatct WinCan, Switzerland sales@wincan.com (keyword drone import). The module will then be activated free of charge |
. |
WinCan VX, Version |
Version |
14. |
2 or higher | Download from www.wincan.com |
Flyability Inspector Software
Paid premium version required in order to create the trajectory point cloud that is needed for the WinCan VX import
Prepare project in Flyability-Inspector Software
...
To be able to import the drone data into WinCan VX, the following 4 POI's have to be added:
Tag/POI | Description |
---|---|
start_manhole | Cover level |
stop_manhole | Pipe level |
start_inspection | Pipe start |
stop_inspection | Pipe end |
...
Info |
---|
start_manhole, stop_manhole, start_inspection and stop_inspection must be added to the POI's as tags (therefore do not use the fields "Name" or "Comment"). Also be sure to pay attention to the spelling. The tags must be written in lower case. |
...